MIE, Japan
Grid Apex designs, builds, and leases purpose-built AI-ready data center facilities in Japan — engineered from the ground up for the extreme power, cooling, and density demands of next-generation AI workloads.
Grid Apex is a startup building the next generation of AI-ready data centers in Japan. Our first 100MW campus is purpose-engineered from day one for the extreme power density, advanced cooling, and rapid scalability that AI workloads demand.
Our core business is simple: we build AI-ready warm-shell facilities and lease the real estate to hyperscalers, AI labs, and enterprises — so tenants can deploy their GPU infrastructure into a space that's already optimized for them.
We build the facility. You bring the compute. Grid Apex delivers turnkey warm-shell data center space purpose-built for AI — ready for your hardware from day one.
Fully built-out data center shells with high-density power, structural reinforcement, and cooling infrastructure pre-installed — ready for tenant fit-out with GPU racks and networking on move-in.
Pre-plumbed direct-to-chip and rear-door liquid cooling systems supporting 100+ kW per rack, enabling tenants to deploy the densest AI hardware without thermal constraints.
Modular, factory-built AI compute containers that arrive pre-wired and pre-cooled — dramatically compressing deployment timelines from 18 months to as little as 6 months.
On-site renewable energy generation paired with grid-scale battery storage systems, reducing grid dependency and delivering sustainable power for energy-intensive AI workloads.
Our first campus in Japan is engineered for 100MW of IT load capacity with redundant utility feeds, on-site generation, and the electrical backbone to support massive GPU deployments.
Custom lease structures from single halls to full campus builds, with scalable power increments — allowing tenants to grow from initial deployment to full-scale AI operations.
Every design decision — from the foundation slab to the cooling manifolds — is made with the unique demands of AI compute in mind.
Our warm shells arrive with liquid cooling infrastructure pre-installed — chilled water distribution, manifold connections, and rear-door heat exchanger capacity — eliminating the #1 bottleneck for high-density GPU deployment.
Factory-built AI compute containers are manufactured in parallel with site work, pre-tested, and shipped ready to connect — compressing typical 18-month builds to 6 months or less.
On-site solar, grid-scale battery systems, and Japan's renewable energy credits ensure that AI workloads run on clean power — meeting ESG requirements and reducing long-term operating costs.
Redundant utility feeds, on-site backup generation, and an electrical distribution system rated for 100+ kW per rack — ensuring the campus can absorb the densest GPU hardware available today and tomorrow.
Our first 100MW AI-ready campus is under construction. Whether you need a single hall or an entire building, let's discuss how Grid Apex can be your launchpad in Japan.